2016 Lemon Grove BMP Design Manual

Print
Press Enter to show all options, press Tab go to next option

Stormwater Requirements for Development & Redevelopment Projects

The City of Lemon Grove is pleased to present the Lemon Grove Best Management Practices (BMP) Design Manual for all New Development and Redevelopment Projects.  The Lemon Grove BMP Design Manual conforms to the new development and redevelopment requirements of the 2013 Municipal Storm Water Permit (Order No. R9-2013-0001) and is based on the Model BMP Design Manual developed for the San Diego Region. February 2, 2016 is the effective date of the Lemon Grove BMP Design Manual which supersedes the City’s Standard Urban Stormwater Mitigation Plan (SUSMP).  An electronic copy of the Lemon Grove BMP Design Manual and associated forms are provided below.  A hard copy of the manual is available at City Hall.  City staff will be available to help answer any of your questions. 

 

Please contact the City’s Development Services Department at (619) 825-3800

 

Lemon Grove BMP Design Manual

Lemon Grove BMP Design Manual Appendices

Stormwater Facilities Maintenance Agreement

O & M Tables for PDP SWQMP

SWQMP Template

SWQMP Template- Word Document

Worksheets for PDP SWQMP- Excel Format

Appendix I Form I-1

Appendix I Form I-2

Appendix 1 Form 1-3